Mapei Latexplan Trade Fast 2 Part Kit 20+4kg

Product code: 09026

Shipping Icon

Standard Delivery

3-5 Days

£33.65£28.04

Incl. VAT
Total:
£33.65£28.04
Truck Shipping Icon

Standard Delivery

3-5 Days

Customer service is excellent at insulation point. They go the extra mile to help out and that’s important as a supplier. Will definitely use again. Thank you

Nationwide Delivery
Speak Our Team

Two-part rapid curing smoothing/levelling compound. Moisture tolerant. Suitable for use on most old adhesive residues including bitumen.

Where to Use

  • Latexplan Trade Fast is used for levelling and smoothing differences in thicknesses of 3 to 10 mm (in one application) where rapid installation of all types of floor coverings is required on new and existing substrates.
  • Latexplan Trade Fast is suitable for high intensity, wheelchair traffic and chairs with castors. Can also be used over most old adhesive residues including bitumen.
  • Latexplan Trade Fast is also suitable for use with underfloor heating.

 

Some application examples

Smoothing concrete floors, sand:cement screeds, MAPEI Mapecem and MAPEI Topcem screeds. For smoothing over existing flooring in concrete, terrazzo, ceramic, porcelain tiles and natural stone (after applying a suitable primer if required).

 

Technical Characteristics

  • Latexplan Trade Fast is a two-part cement based smoothing compound consisting of a grey powder (part A) containing special cements, graded silica sands and additives to be mixed with a synthetic rubber latex (part B).
  • Latexplan Trade Fast can receive foot traffic after approximately 60 minutes and is ready to install floor coverings after 2½-3 hours depending on the thickness and ambient temperature.
  • Latexplan Trade Fast has a very low odour making it suitable for use in confined and inhabited areas, where working and/or occupation must be maintained.
  • Latexplan Trade Fast should not be mixed with any additional latex liquid or any water.
  • Latexplan Trade Fast is moisture tolerant and suitable for use under MAPEI damp proof membranes.

 

Coverage

  • One unit (Fine Powder + Runny Liquid) will cover approximately 4.5-5 m² at 3 mm thickness.
Mapei Latexplan Trade 2 Part Kit is also available in the following:
ProductsLink to products
25+5 KgClick here
Standards

EN 13813:2002 CT-C30-F7

CPR 305/2011

Loading Viewer...


Loading Viewer...


Loading Viewer...

Delivery Information & Instructions

Delivery charges are included in the final shopping basket and apply to mainland UK, excluding the Islands, Scottish Highlands, and specific postcodes: AB, BT, DD, GY, HS, IM, IV, JE, KA, KW, LD, LL, PA, PH, PL, PO, SA, SY, TR, ZE. Additional charges may apply for these areas. Please contact us before placing your order if your delivery postcode falls in these areas.

To ensure smooth deliveries, please provide detailed information about your site when placing your order. This will help us plan delivery routes effectively.

Key Points to Note:

  1. Road Access:Inform us of any restrictions (narrow roads, low bridges, weight limits) that might prevent a 26-tonne lorry from entering.
  2. Moffett Requirements:If a Moffett is needed for offloading, let us know in advance so we can make the necessary arrangements.
  3. Site Obstacles or Restrictions:Notify us of any on-site obstacles (height restrictions, overhead wires, tight turning spaces) to aid our drivers in planning their approach.

Delivery Time and Order Confirmation

At Insulation Point, we strive to keep you informed throughout the order and delivery process. Here’s what you can expect:

  • Order Confirmation: After placing an order, you’ll receive a confirmation email with details of your purchase. Review this to ensure accuracy.
  • Processing Time: Orders are processed within 1-2 working days, depending on product availability and other factors.
  • Delivery Email: You’ll receive an email confirming delivery detail within 1-2 working days after processing, including an estimated delivery date.
  • Lead Time: Deliveries to mainland UK typically take 3-5 working days. Kingspan products may take 5-7 working days.
  • Manufacturer Availability: Delivery schedules may vary. If changes or delays occur, we’ll notify you via email or phone.
  • Product Availability and Alternatives: If a product is unavailable, we’ll inform you and suggest suitable alternatives.
  • Delivery Time Window: Specific delivery times cannot be provided, but we’ll aim to deliver on the scheduled date.
  • Delivery Tracking: Tracking is not available, but you’ll receive email updates on your order status.
  • Failed Deliveries and Re-delivery Charges: Ensure someone is available to receive the delivery. Re-delivery charges may apply if delivery fails due to unavailability or inaccurate details.
  • Booking Tradespersons/Builders: Schedule tradespersons/builders only after your items have arrived to avoid conflicts or charges.
  • Email Communication: Check your junk/spam folders if you don’t see our emails. Contact our team for any assistance.

For more in-depth delivery information, please refer to our delivery policy page.

Reviews

There are no reviews yet.

Be the first to review “Mapei Latexplan Trade Fast 2 Part Kit 20+4kg”

Your email address will not be published. Required fields are marked *